Metal Building Packages
Metal Building Packages, Scoped Before They're Ordered
A steel building package is not one fixed list of parts. Metal Building Resources helps owners, builders, and developers define what a pre-engineered metal building package covers, what it does not, and what must be priced separately, before procurement.
What a metal building package may include
Pre-engineered metal building (PEMB) packages, sometimes called steel building packages or metal building material packages, are manufactured components shipped to site for erection. Contents vary by manufacturer, building, and the scope agreed in writing. Never assume two packages are identical.
Standard package components
Commonly part of a material package, confirmed per quote.
- Primary structural framing
- Secondary framing
- Roof panels
- Wall panels
- Trim and flashings
- Closures and fasteners
- Engineering supplied with the building system, where applicable
Project-specific options
Included only when specified.
- Framed openings
- Doors and windows
- Insulation options
- Roof and wall configuration
- Accessories
- Freight and delivery logistics
Generally outside the package
Often priced and contracted separately.
- Foundations and concrete
- Site work
- Utilities
- MEP
- Interior buildout
- Erection labor unless separately contracted
- Permits
- Unloading and equipment
- Other project-specific exclusions
How MBR scopes a package
Scoping is the work of turning an idea into a written, comparable package definition. MBR reviews your intended use, dimensions, location, openings, and options, then coordinates with the manufacturer so the quote reflects the actual building rather than a generic assumption.
The goal is to surface gaps early: an unframed opening, an insulation assumption, or a missing foundation interface is cheaper to resolve on paper than on site.
Information needed for accurate pricing
- Width, length, and eave height
- Project address or ZIP code
- Intended use and occupancy
- Roof pitch and configuration
- Door, window, and opening sizes and locations
- Insulation and panel preferences
- Existing plans or sketches, if any
- Delivery access and timeline
Why snow, wind, location, height, and openings matter
Design loads come from the project location and applicable code, so the same footprint can require different framing in different places. Snow and wind criteria affect member sizing. Eave height changes frame and panel quantities. Large openings interrupt wall framing and may require additional structural members. Location also drives freight.
Final design loads are determined with the manufacturer and applicable engineering for your jurisdiction. MBR does not replace local code review or a project engineer of record.
Manufacturer and engineering coordination
Each manufacturer has its own requirements for submitting building data, producing drawings, and releasing material. MBR coordinates that information flow and helps keep customer inputs consistent. Engineering is supplied with the building system where applicable. Foundation design and site-specific engineering are separate and depend on your project.
Procurement steps
- Define the building, location, and options.
- Review inclusions and exclusions in writing.
- Confirm engineering inputs and any open items.
- Review package pricing and freight against project-specific requirements.
- Coordinate order release, drawings, and delivery planning with the manufacturer.
Pricing, lead times, and availability depend on the manufacturer, project, and timing, and are confirmed in your quote. For background on cost drivers, read what drives metal building cost. See building types or the preconstruction process.
Package cost versus project cost
Use the estimator or designer for a preliminary planning figure, then request a project-specific quote. Package guidance from Johnny Brokken, Founder and the MBR team is general planning information, not an engineering design or binding price.
Keep planning
Ready to scope your building?
Share your project details and MBR will follow up to review scope.
